Overview

Progress photos of our current project

1. Site Preparation

2. Demolition Stage



3. Sewer & Storm Water Stage



4. Piering and Slab Work Stage



5. Reinforcing Ground Floor and Bricklaying Stage



6. Structural Steel and Timber Framing (Wall/Floor/Roof)

7. First Floor External Walls & Roof Covering



8. Window Installation



9. Internal Gyprocking & Waterproofing



10. The Finishes: Bedrooms, Wardrobes & Linen



11. First Floor Front and Back Balconies



12. Butler, Laundry and Kitchen/Dining Room



13. External Facade



14. All Bathrooms